Building Safety (Wales) Act 2026

Wales has built a different regime and a much broader one. It has no height threshold for entry and three categories of building rather than one. Houses in multiple occupation are in scope. County councils act as the regulator rather than a national body. Almost none of it is in force yet.

Statutory basis
Act
Building Safety (Wales) Act 2026, 2026 asc 5
Royal Assent
27 April 2026
In force
ss.1 to 9, 13 to 17, 133 to 136, 137(3) to (4), 138, 140 from 28 April 2026 In force
Everything else
Not yet commenced No commencement order has been made
Regulator
Three building safety authorities, designated county or county borough councils. None designated yet
18m / 7 storeys 11m / 5 storeys ground ENGLAND Higher-risk building Full Part 4 regime Safety case report Certificate on direction Outside the in-occupation regime entirely WALES Category 1 Safety case report, sent to the authority Building certificate Category 2 Fire and structural duties Category 3 Fire safety duties and complaints arrangements ALL ARE REGULATED BUILDINGS Both regimes require at least 2 residential units. England adds a height threshold on top of that. Wales does not. An English screen looking for 18 metres or 7 storeys will miss most of a Welsh estate.
Scope compared. The Welsh Act has no height threshold for entry, so every building with two or more residential units is regulated and then tiered by category.

What is in force

No operational duty under this Act is currently enforceable. Royal Assent was given on 27 April 2026. Only sections 1 to 9, 13 to 17, 133 to 136, 137(3) and (4), 138 and 140 came into force the following day. Those are definitions, key terms and regulation-making machinery.

Everything of substance still waits for commencement orders from the Welsh Ministers under section 138(2). That includes safety case reports, building certificates, resident engagement, enforcement and the HMO provisions. No commencement order has been made. No building safety authorities have been designated. No dates have been announced.

Much commentary describes Welsh duties as though they already apply. They do not.

Regulated buildings: no height threshold

Under section 2, a regulated building contains at least two residential units and is wholly or mainly in Wales. Buildings described in Schedule 1 are excluded. There is no height or storey test at the point of entry.

Every block of flats in Wales is a regulated building. The regime then tiers those buildings by category and attaches different duties to each.

CategoryDefinition (section 6)Broad duty position
1At least 18 metres, or at least 7 storeysEverything: safety case report, occurrence recording, resident engagement strategy, building certificate, complaints system, special measures
2Under 18 metres and fewer than 7 storeys, but at least 11 metres or at least 5 storeysFire and structural safety duties, plus a resident engagement strategy when occupied
3Under 11 metres and fewer than 5 storeysFire safety duties and complaints arrangements

Fire safety risk duties under sections 29 to 33 apply to all regulated buildings. Structural safety duties under sections 34 and 35 apply to categories 1 and 2. The category 1 only duties sit in Chapter 5.

There are rules for counting storeys:

  • a mezzanine counts where it is at least half the internal floor area of the largest above-ground storey;
  • a storey is below ground only where the whole finished ceiling surface is below ground level; and
  • where ground level is uneven, you take the lowest adjacent point.

These rules decide which category a building falls into.

Houses in multiple occupation are in scope

Part 2 has no equivalent in the English Act. A relevant HMO is an HMO within the meaning of the Housing Act 2004 as it applies to Part 1 of that Act. It must be wholly or mainly in Wales. Converted blocks of flats under section 257 and the exclusions in section 78(3) are left out.

The landlord must assess fire safety risks and the assessment must be made by a competent person. Duty holders must manage the risks. Information duties run in both directions and occupiers have duties too. The Welsh Ministers may extend Part 2 to mobile homes.

The regulator is local government

Under section 122, a building safety authority is a county council or county borough council designated in regulations by the Welsh Ministers. The regulations must designate one council for each fire and rescue authority area in Wales. That means three building safety authorities, one per fire service area. The function cannot be an executive function of the council.

A fire safety authority under section 126 is a fire and rescue authority for an area in Wales. For premises that are wholly Crown premises, it is a fire inspector. There is no Welsh equivalent of the Building Safety Regulator. No councils have yet been designated.

Safety case reports differ in four material ways

Section 37 is not a copy of section 85 of the English Act.

  • You must send it in. Section 37(4) requires the principal accountable person to give a copy to the building safety authority as soon as possible after preparing it. Section 37(7) requires a copy of any revised report with a notice summarising the changes. In England there is no automatic duty to submit. The regulator calls it in.
  • Fire and structural are separated on the face of the Act. The content splits into four parts. These are the current fire risk assessment, the section 33 fire management steps, the current structural risk assessment for each accountable person’s part and the section 35 structural management steps. Detailed content will come from Welsh regulations.
  • The authority can direct a revision. Section 37(6) gives the building safety authority a power that England’s section 85 does not contain. There is also a standing duty to keep the report under review and up to date.
  • The trigger includes section 37 coming into force. The duty applies from the latest of four events. These are occupation, the building becoming a category 1 building, becoming principal accountable person or section 37 coming into force.

What a Welsh dutyholder should do now

Nothing under this Act is enforceable yet and nobody can tell you when it will be. The definitions that decide your position are already in force and will not change when the rest of the Act starts. They cover regulated building, category, accountable person and principal accountable person.

Work out which category each of your buildings falls into and who the principal accountable person is. That work will not be wasted and does not depend on a start date. If you hold buildings on both sides of the border, the screen that matters is scope. An English screen looking for 18 metres or seven storeys will miss most of a Welsh estate.

The rest of the Act

Most commentary stops at safety case reports. The Welsh Act is much wider than that. The parts below will matter to anyone holding residential property in Wales. None of them is in force yet.

ProvisionWhat it covers
Chapter 7, sections 47 to 53Duties to keep and provide information and documents, including on a change of accountable person. They also cover a complaints system. Category 1 buildings require the principal accountable person to operate one; categories 2 and 3 require arrangements for considering complaints
Chapter 8, sections 54 to 62Duties on residents and unit owners themselves, covering fire safety, structural safety in categories 1 and 2, a duty to repair the fire resistance of a residential unit, rights of entry for repairs and warning notices an accountable person can serve
Chapter 9, sections 63 to 66Review and appeal of reviewable decisions, with appeal to the residential property tribunal
Chapter 10, sections 67 to 77Co-operation between accountable persons, recovery of relevant costs, implied lease terms, tenant liability for building safety costs and the exclusion of enforcement costs from variable service charges
Part 3, sections 94 to 111Enforcement. Information notices, compliance notices, prohibition notices, powers of entry, offences including contravention giving rise to risk of death or serious injury, special measures managers for category 1 buildings and fixed penalty notices
Part 4, sections 112 to 118Remediation of certain defects, including remediation orders, remediation contribution orders, qualifying leases and remediation costs

Two of these deserve particular attention. The duties on residents in Chapter 8 have no direct English equivalent at this level of detail. They change the relationship between an accountable person and the people living in the building. The implied lease terms and service charge provisions in Chapter 10 will affect how building safety costs can be recovered. That is a commercial question as much as a safety one.

Fire safety duties reach every regulated building

This is the provision most likely to be missed. Sections 29 to 33 apply fire safety risk duties to all regulated buildings, not only to the tall ones. The principal accountable person must make sure fire safety risks are assessed by a competent person. The assessment must be reviewed. Accountable persons must manage the risks it identifies.

A portfolio holder screening for 18 metres will find the buildings needing a safety case report. They will miss the far larger number that need a fire risk assessment by a competent person. Structural duties under sections 34 and 35 then add category 1 and category 2 buildings on top.

What to do before the rest of the Act starts

Nothing here is enforceable yet and no date has been announced. The definitions that decide your position came into force on 28 April 2026. They will not change when the rest of the Act starts. That makes the following work safe to do now.

  1. Screen the estate against section 2, not against a height threshold. Every building with two or more residential units wholly or mainly in Wales is a regulated building.
  2. Categorise each one under section 6, applying the storey counting rules for mezzanines, below-ground storeys and uneven ground.
  3. Identify the accountable persons under section 8 and the principal accountable person under section 9. That turns on who is responsible for the external structure, meaning the foundations, external walls and roof.
  4. Identify any relevant HMOs under section 78. They are in scope under Part 2 and are easy to overlook because they sit outside the regulated building definition.
  5. Check who holds the repairing obligations in the leases. The accountable person test turns on this and it is the step most often assumed rather than checked.
  6. Map what a safety case report would need for any category 1 building, since section 37 requires it to be sent to the building safety authority rather than called in.

None of this requires knowing the start date. All of it takes longer than the notice period is likely to be.

Common questions

Does the Building Safety Act 2022 still apply in Wales?

Parts of it do and Welsh commencement regulations have been made under it, including for the design and construction regime. The 2026 Act builds a distinct Welsh regime for buildings in occupation. Anyone advising on a Welsh building needs to establish which regime governs the specific question rather than assuming one.

When will the Welsh Act come into force?

Unknown. Commencement is by order of the Welsh Ministers under section 138(2). No order has been made. Section 139 provides for progress reports on bringing the Act into force. It is itself not yet in force. Treat any specific date you are given as speculation unless it cites a commencement order.

Which council will regulate our building?

Not yet knowable. Section 122 requires the Welsh Ministers to designate one county or county borough council for each fire and rescue authority area, giving three building safety authorities. No designation regulations have been made, so nobody can tell you which council it will be.

We hold buildings in England and Wales. Can we run one process?

Partly. The evidence base overlaps heavily, so the underlying survey and assessment work is largely common. The screening, the duty triggers and the submission obligations differ enough that a single process applied uniformly will under-scope the Welsh estate. Screen separately, then share the evidence.

Read from the Act text on legislation.gov.uk, current as to changes in force on or before 17 September 2026. A search on 16 October 2026 found no commencement order. We monitor for commencement orders and will update this page when one is made. Last reviewed 16 October 2026.