Why the BSR Refuses Building Assessment Certificates

Two out of every three building assessment certificate applications assessed this year were refused. The Building Safety Regulator has published why and what it intends to change. This page explains what the refusals have in common. It also gives you a test you can apply to your own safety case report.

66%
of building assessment certificate applications were refused this yearAround 2,000 buildings have been directed to apply since April 2024, across more than 6,000 accountable persons in England. Processing is taking twice as long as the regulator first expected.Building Safety Regulator, 9 July 2026
Statutory basis
Regime
Building Safety Act 2022, Part 4 In force
Duty holder
The principal accountable person
Process
Preparing a building assessment certificate application, last updated 1 April 2026
Status
Regulator changing approach Duties themselves are unchanged

The stated reason for refusal

The regulator says applications “typically” fail because they address process compliance rather than effective safety management. Here is what that means.

A process compliance submission answers one question. Do you have the things the Act requires? It lists the fire risk assessment, the structural survey, the resident engagement strategy and the mandatory occurrence reporting system. Everything is present and everything is in date.

The problem is that the report reads as an inventory. Where is the narrative? Why did you choose this resident engagement strategy? Why does your mandatory occurrence reporting start with that first cascade of instruction, given your team structure?

The same goes for the structural survey. Who carried it out? What did their findings reveal about the building’s structural integrity? How does that feed into your maintenance programme?

What effective safety management looks like

An effective safety management submission answers a harder question. How do you know the controls in this building are working? It shows real thought about how you manage the building.

The report explains how findings become actions and how actions get owners and dates. It shows how overdue actions reach someone with the authority to act. It also shows a system that makes sure lessons are learnt and acted on.

A test you can apply to your own report today

Pick a single safety control in your building. Your fire door inspection regime is a good place to start. Now check whether the document alone can answer all five of these:

  1. What did the last inspection find?
  2. What happened to each finding?
  3. Which findings are still open?
  4. Who owns each open item and when is it due?
  5. How is the building still safe while those items remain open?

If your report can only show that the regime exists, you have a process compliance submission. That is the pattern the regulator is refusing. Use claim, argument, evidence to fix it.

What the regulator has said it will change

The July 2026 statement leaves every duty in place. The regulator accepted that its assessment model was not scaling and set out measures to fix it.

  • Fewer call-ins for now. New applications will only be called in where necessary, until improved processes are agreed.
  • Applications already in assessment get priority. If you are in the queue, you stay in the queue.
  • Fast-track reassessment for previously refused certificates is being explored. This matters most if you have already been refused once.
  • An intelligence-led, risk-based model focusing first on organisations responsible for multiple higher-risk buildings. It uses sample interventions rather than building-by-building review.
  • More time for small, volunteer-run resident management companies. Pre-application advice is being explored for the 2,000 or so resident-managed higher-risk buildings.
  • Simplified assessment criteria and clearer technical guidance on what makes a structural or fire risk assessment suitable, developed with the professional bodies.

Do not misread this as a grace period

The regulator was explicit on three points. All legal duties remain enforceable. They have been enforceable since January 2024. Safety case reports must not wait for an assessment to be called in.

A quieter call-in rate is a queue management decision. It is not permission to slow down. A building that has not been called in yet is not a building that is compliant.

What a refusal costs

The £312 application fee is the smallest part of it. A refusal produces a contravention letter or a compliance notice. A compliance notice must be displayed prominently in the building, where residents, leaseholders and prospective buyers will see it.

Re-application means redoing the underlying work and paying assessment costs again. You do so under a regulator that now has a file on you. If you are a managing agent, a refusal is also a conversation with your client.

The organisations most exposed

The regulator will now focus first on organisations responsible for multiple higher-risk buildings. That is uncomfortable for portfolio holders. The regulator is now more likely to examine how you manage buildings in general than any one building in isolation.

A weakness that repeats across your portfolio is therefore a larger problem than a weakness in a single block. It is evidence about your organisation rather than about a building.

What the regulator assesses

A common mistake is to treat the assessment as a review of the safety case report. That is not what the regulator is doing. It assesses whether the principal accountable person is meeting their Part 4 duties. The report is how you show you understand those duties, backed by evidence.

The application must include:

  • confirmation that the regulator’s records for the building are current;
  • the safety case report;
  • information about the mandatory occurrence reporting system;
  • the resident engagement strategy;
  • serial numbers of any compliance notices in force; and
  • confirmation that building information is being provided to the people who need it.

Source: GOV.UK, Apply for a building assessment certificate.

In our experience, a strong application also rests on:

  • a hazard identification workshop;
  • a thorough audit of your safety management system; and
  • a narrative that makes a claim, sets out the argument and backs it with evidence.

The regulator may also request further records or hold meetings. It may ask for a system to be demonstrated rather than described. A report written without an audit of the management system tends to fall apart at that point. The claim, the argument and the evidence stop lining up.

Reading the July 2026 measures properly

Each of the announced changes tells you something about what went wrong. Each one also has a practical consequence.

MeasureWhat it impliesWhat to do about it
Only call in new applications where necessaryThe queue outran the assessment capacityDo not read a quiet inbox as compliance. Prepare as though you will be called next quarter
Prioritise applications already in assessmentThose in the queue are not being deprioritisedIf you are mid-assessment, keep responding promptly. Requests for information carry short windows
Explore proportionate fast-track reassessment for refused certificatesThe refusal rate is understood to be partly a process problem, not only a dutyholder oneIf you have been refused, this is the most important sentence in the statement. Track it
Intelligence-led, risk-based model targeting multi-building organisations firstThe unit of scrutiny is shifting from the building to the organisationAudit for weaknesses that repeat across your portfolio as well as weak individual buildings
Sample interventions rather than building by building reviewA sample will be taken as representativeYour weakest building is now a statement about all of them
More time for small volunteer-run resident management companiesRMCs were disproportionately affectedIf you are an RMC, watch for the pre-application advice being explored
Simplified assessment criteria and clearer technical guidanceWhat counts as a suitable fire or structural risk assessment was not clear enoughWhen published, re-test your existing assessments against it rather than assuming they pass

What happens after a refusal

You cannot resubmit a refused application at leisure. A refusal produces a formal outcome with consequences that residents and leaseholders can see.

  1. A contravention letter or a compliance notice. A compliance notice sets out what must be done and by when.
  2. A display duty. A compliance notice must be displayed prominently in the building, where residents, prospective buyers, lenders and their conveyancers will see it.
  3. The underlying work has to be redone. The application was refused because the substance did not satisfy the regulator. Re-submitting the same material achieves nothing.
  4. Costs recur. The application fee is payable again. Assessment costs are charged separately under the regulator’s charging scheme.
  5. A record exists. The next assessment is not a blank sheet.

For a managing agent, there is a further consequence that does not appear in any guidance. A refusal is a conversation with the client. It is usually a difficult one. Where an agent was engaged to deliver compliance, a refusal reads as a failure of that engagement, wherever the evidence gaps came from.

If you have already been refused

The most useful line in the July 2026 statement is also the least reported. The regulator is exploring proportionate fast-track reassessment for previously refused certificates. You may be able to take that route rather than starting again. Find out whether your building qualifies before you commit to a full re-submission.

Start the work in the meantime. Identify which assessed areas the refusal turned on. Fix the substance rather than the presentation. Show that every control the report relies on is backed by claim, argument and evidence.

Common questions

Does a refusal mean the building is unsafe?

Not necessarily and the two questions are separate. A refusal is a finding that the principal accountable person has not demonstrated they are meeting their duties. A building can be well managed and still fail to evidence it and the regulator assesses the evidence.

Has the 66% figure been published officially?

Yes. It comes from the Building Safety Regulator’s own statement of 9 July 2026, which is linked in the sources below. It refers to applications assessed so far in that year, not to all buildings in scope.

Should we wait for the simplified assessment criteria?

No. The regulator was explicit that all legal duties remain enforceable and unchanged and that safety case reports must not wait. Waiting also leaves you with less time when the criteria do arrive.

We hold several buildings. Where should we start?

With the management system rather than with a building. The shift to an intelligence-led model means the regulator is more likely to form a view about your organisation than about one block. A weakness that repeats across a portfolio is evidence about how you operate.


Sources

Last reviewed 16 October 2026. No newer refusal figure than the 9 July 2026 statement and no simplified assessment criteria had been published when this page was last checked on 2 October 2026. This page will be updated when the regulator publishes either.