The Building Safety Levy has been in force since 1 October 2026. It applies to building control applications made on or after that date. Applications made before it are out of scope. The application date is the whole test. For any scheme submitted in the weeks around the levy’s beginning, it is the first fact to establish and evidence.
This page is read from the regulations themselves rather than from summaries of them. Every figure below sits in SI 2025/1236, as amended by SI 2026/1034. The regulation or schedule is cited so you can check it against the source. For what the levy means for programmes and why the completion certificate is now the pinch point, see our analysis.
- Instrument
- The Building Safety Levy (England) Regulations 2025, SI 2025/1236
- Amended by
- The Building Safety Levy (Amendment) (England) Regulations 2026, SI 2026/1034, made 18 September 2026
- In force
- 1 October 2026, both instruments In force
- Extent
- England only
- Test
- The date the building control application is made
- Collected by
- Local authorities designated as collecting authorities, with a spot-check regime, review rights and appeal rights
The date test
The regulations do not apply to a building control application made before 1 October 2026. They also do not apply to later variation applications or commencement notices that relate to one of those earlier applications.
There is no sliding scale. Two identical schemes submitted a fortnight apart either side of 1 October carry different cost bases. For any scheme submitted close to that date, evidence and file the application date now. It is exactly the kind of fact that gets questioned eighteen months later, when someone asks why the levy was or was not payable.
The consequence matters as much. An application pushed in before 1 October to beat the date only helps if it was validly made. A rejected application does not count as made. A resubmission now falls on the chargeable side of the date.
What is chargeable
A building control application is chargeable when two things are true. First, the work creates a new building with residential floorspace, creates residential floorspace where there was none or increases residential floorspace. Second, the work is a major residential development or forms part of one.
| Test | Threshold |
|---|---|
| Major residential development, dwellings | At least 10 |
| Major residential development, purpose-built student accommodation | At least 30 bedspaces |
| Where the building already contains dwellings or bedspaces | Measured as a net increase |
Look closely at the second condition. A building that would not meet the threshold on its own can still be caught if it is part of a wider development that does. Phasing a scheme does not by itself take it out of charge.
What is not chargeable
The regulations contain three separate exemption routes and they work differently. Find the right one early, because each is tested at a different point.
- Exempt buildings, Schedule 1. The building itself falls outside the definition of a residential building.
- Exempt dwellings, Schedule 2. Particular dwellings are taken out of the definition of an ordinary residential dwelling. This affects both the threshold count and the chargeable floorspace.
- Exempt persons, regulation 13. An application is exempt where every named client is an exempt person. Non-profit registered providers of social housing are exempt persons. The word “every” matters here. A joint venture with one non-exempt party does not qualify.
Schedule 1 exempts a building designed or adapted, or in the process of being constructed or adapted, for primary use as any of the following.
- Residential accommodation provided by a school for its students
- A care home within section 3 of the Care Standards Act 2000
- Secure residential institutions, including prisons, young offender institutions, detention centres, secure training centres, custody centres, short-term holding centres and secure local authority accommodation
- A hospital within the National Health Service Act 2006 definition, with at least one bed intended for a patient overnight stay
- Domestic abuse accommodation meeting the 2021 Domestic Abuse Support Regulations
- A children’s home within the Care Standards Act 2000
- A residential family centre within the Care Standards Act 2000
- Supported accommodation for children within the 2022 extension regulations
- A hotel or hostel
- A monastery, nunnery, seminary or almshouse
- Temporary accommodation for homeless people secured under Part 7 of the Housing Act 1996
How the charge is calculated
Regulation 16 sets the formula. For each relevant residential building in the application, add the chargeable accommodation floorspace to the chargeable communal floorspace. Multiply the total by the area rate. Where the application covers more than one building, the amounts are added together. A negative result is treated as nil.
Two points matter most in practice. First, communal space for residents is not charged in full. Regulation 19 applies a set percentage to it. How you split floorspace between accommodation and communal areas therefore has a direct cash effect.
Second, floorspace is measured as gross internal area under regulation 12. That is not the same as a sales area or a net internal figure. If your cost plan uses one basis and your levy calculation uses another, the difference will surface at the worst possible moment.
Regulation 21 gives a lower rate for previously developed sites. Broadly, at least 75% of the land in the planning permission must have been previously developed since 1 July 1948. There are exceptions, including agricultural and forestry land. The test applies once to the whole permission and the answer is yes or no. If your site is close to the 75% line, establish the figure properly rather than assume it.
The amending regulations, SI 2026/1034, tightened this test from 1 October 2026. A building only counts if it was not wholly underground. Any underground part of a building that extends beyond its above-ground footprint is left out of the 75% calculation. Land is not treated as previously developed where the operations carried out on it were not lawful, in the sense used in section 191 of the Town and Country Planning Act 1990.
In the other direction, the definition of a building now includes permanent man-made structures. These expressly include load-bearing reinforced areas, paved or surfaced areas and plant and machinery. On the face of the wording, hardstanding can therefore count. A basement reaching beyond the building above it does not. Rerun any 75% calculation prepared before 1 October against the amended wording.
What the rates look like
Schedule 3 sets an area rate for every collecting authority in England. There are two columns, one for previously developed land and one for all other land. The spread is wide. The rate for other land is double the previously developed rate.
| Collecting authority | Previously developed land | Other land |
|---|---|---|
| County Durham, the lowest rate in Schedule 3 | £6.35 | £12.70 |
| Adur, mid-range for illustration | £19.45 | £38.91 |
| Kensington and Chelsea, the highest rate in Schedule 3 | £50.17 | £100.35 |
That is close to an eightfold difference between the cheapest and most expensive authority on the same type of land. Between the cheapest previously developed rate and the most expensive greenfield rate, the difference is sixteenfold.
For a housebuilder working across regions, the levy is not one national cost. It changes with location and belongs in your appraisal alongside land value. It also depends on the previously developed test, so the two need to be worked out together.
Who pays and when
- Who. The named client for the application, defined for each application type in Schedule 4.
- When. The earlier of the completion notice date and the first date of occupation. For higher-risk buildings, the completion notice date is the date of the completion or partial completion certificate application to the regulator.
So the bill comes together at the end of the job. The amount is fixed by decisions taken at the beginning. That gap is where the commercial risk sits, particularly where the named client changes during construction. Regulation 34 covers exactly that and requires the new named client information to be passed on.
If the scheme changes after you apply
Part 8 deals with variation applications. A variation can change the levy position. Regulation 43 provides for levy determination notices to be cancelled and reinstated when it does. Change control on a higher-risk building feeds into this through regulations 44 and 45. So does an amendment notice under the registered building control approver route.
The levy figure you receive early is not necessarily the figure you pay. Design changes that move floorspace, change the dwelling count or alter the accommodation and communal split can all move it. Nothing quietly absorbs the difference.
Spot checks and levy updates
Part 9 creates a spot check regime for levy information. Regulations 47 and 48 set out two sets of circumstances in which a collecting authority must carry one out. Regulation 49 requires the named client to be told. Regulation 50 allows further information to be demanded and requires notice of the outcome. Regulation 51 deals with inaccurate levy information. Where a check changes the position, regulations 52 to 54 provide for levy update notices and for a revised determination to be requested.
The information you submit can be audited after the event, by an authority with a legal duty to audit some of it. Keep the floorspace schedule behind your levy return. Expect to have to produce it and defend it.
If you think the figure is wrong
Regulation 71 gives only the named client the right to ask for a review of three types of decision:
- the issue of a levy liability notice and the amount in it;
- the revision of a notice and the revised amount; and
- a refusal to issue a refund, or the amount of a refund.
Refunds
Regulations 65 and 66 provide for refunds of levy payments under a set of conditions labelled A to K. Regulation 67 deals with the knock-on effect on the levy liability amount, the liability notice and the payment certificate. A refund is a defined legal route. Know about it before you write off an overpayment.
The enforcement lever is the certificate
The regulations amend the building control rules so that completion certificates and final certificates can be withheld or rejected where the levy is unpaid. Regulations 57 to 62 do this across all three routes. Those are local authority building control, the registered building control approver route and the higher-risk building regime.
There is no separate penalty system because none is needed. The levy is enforced by blocking the one document you cannot occupy the building without. If sales or lettings depend on practical completion, an unpaid levy becomes a programme problem. The completion certificate cannot issue until it is resolved.
What to do now
- Record the application date for every live scheme, with the evidence. Give anything submitted in the weeks either side of 1 October a second look.
- Establish the previously developed position for each site against the amended 75% test. Include any underground elements and the lawfulness of past development while the evidence is still to hand.
- Check your Schedule 3 rate for each collecting authority you build in. Put it into your appraisal rather than using a national average.
- Fix the floorspace basis. Agree one gross internal area schedule with the accommodation and communal split identified. Keep the working.
- Confirm the named client for each application type against Schedule 4. Check whether an exempt-person route applies to every named client, not only the lead one.
- Build the 28-day review window into your process so a levy liability notice is checked on arrival rather than filed.
Common questions
Is the Building Safety Levy in force?
Yes. It has applied since 1 October 2026 to building control applications made on or after that date, under SI 2025/1236 as amended by SI 2026/1034. Applications made before it are out of scope, as are later variation applications and commencement notices relating to them.
Does the levy apply to schemes already on site?
Not where the original building control application was made before 1 October 2026. The test is the date the application was made, not the date work starts or the date the levy would otherwise fall due.
Is social housing exempt?
An application is exempt where every named client is an exempt person and non-profit registered providers of social housing are exempt persons. A joint venture that includes a non-exempt party does not qualify.
Who collects the levy, and when is it paid?
The local authority for the area where the building is, whichever building control route is used. The named client pays at the earlier of the completion notice date and the first date of occupation.
What happens if the levy is not paid?
Completion and final certificates can be withheld or rejected under regulations 57 to 62, across all three building control routes. An unpaid levy therefore blocks the certificate needed to occupy the building.