Resident Engagement Strategy

The resident engagement strategy is one of the duties the regulator assesses alongside your safety case report. It is also the one most often treated as a communications exercise rather than a statutory document. It is not about newsletters. It is about which building safety decisions residents get a say in and how you prove you took their views into account.

Statutory basis
Duty
Building Safety Act 2022, Part 4 In force
Duty holder
The principal accountable person prepares it, maintains it and must ensure compliance with it
Applies to
Occupied higher-risk buildings in England
Guidance
Preparing a resident engagement strategy, last updated 6 December 2024
Wales
Building Safety (Wales) Act 2026, ss.40, 41 and 46 Not yet commenced

What the strategy must contain

RequiredWhat an assessor is looking for
Which building safety decisions residents will be consulted onA specific list, not a general commitment to consult
What information will be provided to residentsWhat, when and in what form
How opinions will be collected and usedThe mechanism and evidence that views changed something
Communication methods accommodating different needsAccessible formats, languages and residents who cannot use the default channel
Feedback processesWhat a resident hears back and how quickly
Submission timescalesHow long residents have to respond
GDPR compliance for data handlingWhat personal data you hold and on what basis
How participation will be measured and reviewedA measure, not an intention. This is the one most often missing

What residents must be consulted on

Guidance is specific on one point. Residents must be asked about timing and how to keep disruption down. This applies where works will last more than one day and will block areas of the building or disrupt daily life.

Emergency repairs do not require consultation, which is a sensible decision. The exemption is for emergencies, not for anything urgent. A pattern of works classified as emergencies is the kind of thing an assessor notices.

Say what you will not consult on

This is the part most strategies leave out and it is clearly expected. The strategy should identify which decisions residents will not be consulted on, with an explanation of why.

Stating the boundary openly is stronger than leaving it vague. Some strategies imply that everything is consulted on, when in practice most things are not. That creates an expectation you will fail. It also leaves a gap an assessor can see.

Getting it to residents is a separate duty

The principal accountable person provides the strategy to all accountable persons. Each accountable person then distributes it to residents in the part of the building they are responsible for. Copies should suit different preferences, including paper, email and accessible formats.

Underneath that sits a requirement that is easy to read past and hard to satisfy. Accountable persons must take all reasonable steps to know who lives in their part of the building. They must also understand those residents’ needs. Surveys and visits to units are two ways to do this.

Some buildings have high turnover, subletting or a significant number of leaseholders who do not live there. In those buildings this needs extra care and attention. It also connects directly to the emergency plan in your safety case report. That plan has to account for residents who would need help to evacuate. If you cannot show you know who lives in the building, two duties fail at once.

When it must be reviewed

  • At least every two years, whether or not anything has changed
  • Following a mandatory occurrence report to the Building Safety Regulator
  • After significant material alterations to the building

Each review must be recorded, whether or not it results in changes. A review that changed nothing but was documented is compliant. A review that happened informally and was never written down looks the same as no review at all.

Why this gets assessed

At some point the regulator will tell the principal accountable person to apply for a building assessment certificate. When it does, it looks at the resident engagement strategy. It looks at it alongside the safety case report and the mandatory occurrence reporting system. It also checks live compliance notices and confirmation that building information is being provided.

Two thirds of applications assessed this year were refused. The regulator’s stated reason was that submissions addressed process compliance rather than effective safety management. A strategy that exists as a document but has never clearly influenced a decision is exactly the pattern being refused.

Wales does this differently

Section 40 of the Welsh Act places a similar duty on the principal accountable person for an occupied category 1 building. There are three differences that matter.

  • You must consult on the strategy itself. Under section 40(6), the principal accountable person must consult relevant persons before adopting the strategy. The consultation covers its proposed contents. They must take account of what people say. England has no equivalent duty to consult on the strategy document.
  • Unit owners are expressly included. Relevant persons means adult residents of the building and owners of residential units. Leaseholders who do not live there are in scope by definition.
  • It extends to category 2 buildings. Section 46 applies a resident engagement strategy duty to occupied category 2 buildings. These are below 18 metres and 7 storeys but at least 11 metres or 5 storeys.

Section 40 also defines a building safety decision precisely. It is a decision by an accountable person about the management of the building. It must be made in connection with a duty under the Act. None of Part 1 is yet in force.

Common questions

Is a residents’ association the same as an engagement strategy?

No. An association is one possible channel. The strategy is a statutory document setting out which building safety decisions residents are consulted on and how their views are obtained and used. A building with an active association can still fail the duty if none of that is documented.

What if residents do not engage?

The duty is to promote participation and to have appropriate methods, not to achieve a particular response rate. Low engagement is not itself a breach. Failing to measure participation, or never reviewing methods that plainly are not working, is closer to one. Measuring and reviewing the methods is part of the required content.

Does it cover leaseholders who do not live in the building?

In Wales, expressly yes: relevant persons includes owners of residential units. In England the guidance is framed around residents, so a building with many non-resident leaseholders should decide and document its own position rather than leave it unclear.

Can the managing agent run it?

They can operate it day to day. The duty to prepare the strategy, maintain it and ensure compliance sits with the principal accountable person. Distribution to residents sits with each accountable person for their own part of the building.

Last reviewed 16 October 2026. Sources checked 17 September 2026 against GOV.UK guidance updated 6 December 2024 and the Building Safety (Wales) Act 2026.